Customer-ready fire protection quotations
A workflow that turns an approved internal estimate into a branded client offer — drafting scope, validating commercial terms, checking that exclusions are present and routing approval before anything is issued. Internal cost rows never cross into the customer document.
Sales leadA technically sound estimate becomes an inconsistent offer the moment scope, exclusions, delivery terms and approval status are copied across by hand.
-
Set up the offerSales leadQueuedWorkingDoneSign-off
-
Draft the scopeAutomatedQueuedWorkingDoneSign-off
-
Check exclusionsAutomatedQueuedWorkingDoneSign-off
-
Route approvalApproverQueuedWorkingDoneSign-off
-
Issue and versionSales leadQueuedWorkingDoneSign-off
- Who uses itSales lead, commercial approver
- Lifecycle stagePre-Sales / Tendering
- Buyer groupTrack B · Estimating & Commercial
- RequirementsBRD v0.1, sent as written
What goes in, what comes out
Customer-Ready Quotations, step by step
Five steps, one decision point. The last step is a person, every time.
-
01
Sales lead
Set up the offer
Client, project, validity and commercial terms established once.
-
02
Automated
Draft the scope
Built from the approved estimate rather than retyped from it.
-
03
Automated
Check exclusions
The workflow raises the exclusions the offer does not yet carry.
Every exclusion present?
Yes Ready for approvalNo Missing exclusion added -
04
Approver
Route approval
A commercial approver signs before issue, not after.
-
05
Sales lead
Issue and version
A branded quotation with an issue history, so revision three is not mistaken for revision two.
-
Output
What lands at the end
A branded customer quotation with line values, scope, exclusions, assumptions, validity and a complete issue history.
Who’s involved
What you get
- Branded quotation
- Checked exclusions
- Issue history
In the wireframe
A reviewer spots a missing exclusion for permit fees, adds it, and issues a branded quotation without exposing internal cost rows.
Who does what, and who signs
Automated steps prepare the evidence. People make the calls.
Swipe to see the whole diagram
Why this costs you time today
A technically sound estimate becomes an inconsistent offer the moment scope, exclusions, delivery terms and approval status are copied across by hand. The missing exclusion is the one that becomes a variation argument.
What this software will not do
Life-safety work. These limits are written into the requirements, not added as a disclaimer.
Specific to this workflow
It does not price the work or decide commercial terms. It carries an approved estimate into a consistent client document and stops it going out unapproved.
It does not decide compliance
The software assembles evidence, retrieves source clauses and shows conflicts. It does not determine whether anything complies. A named engineer does.
It does not stand in for an authority
An approval recorded in the software never implies consent from an AHJ, Civil Defence, building control or a building surveyor.
Nothing leaves without a named reviewer
Every output carries who approved it. Anything unverified keeps a draft marker until someone signs it.
It does not do sealed engineering
Hydraulic network calculation, definitive sprinkler layout, sealed design, BIM geometry authoring and final cost estimates are all out of scope by design.
Your standards, not ours
NFPA, EN, BS, ISO, FM, UL, LPCB and Civil Defence appear in the requirements as examples. None is assumed to apply to your projects until you say so.
That is a claim about how fast Colakin builds software with DeX, and it is supported by delivered projects. It is not a claim about what any of these fifteen workflows will save your business. The requirements deliberately leave that to a pilot, measured against your own baseline.
From a question to a pilot, in five steps
Nothing hidden behind a discovery call. Stop at step one and keep the document.
- 01
You ask for the requirements document
The full BRD for the workflow you care about, sent as written.
Same day - 02
A ten-minute wireframe walkthrough
A clickable prototype of that one workflow.
10 minutes - 03
The Fire Fit Check
Five questions: fit, hours lost, who approves spend, whether your documents can be shared, and timing.
One call - 04
A scope built on your rules
Your standards, your document formats, your approval gates.
Within a week - 05
A pilot against your own baseline
One workflow, your data, your engineers.
Q1
Also in Estimating & Commercial
Each one stands alone. Take one first, then decide whether a second earns its place.
Quantity Take-Off & BOM
A bill of materials where every line shows its sheet and zone.
Estimation & Costing
Every rate carries its source, so price changes explain themselves.
Product & Equipment Selection
Certification scope as a hard filter, not a footnote.
Customer-Ready Quotations: questions
Can internal cost rows leak into the client document?
How are exclusions handled?
Does it use our branding?
Can we see what changed between quotation revisions?
Ask for the Customer-Ready Quotations requirements document
The business requirements document as written, including what it refuses to do. No brochure, no drip sequence.
- The requirements document, usually the same working day
- A ten-minute wireframe walkthrough with the people who specified it
- No claimed percentage saving — your pilot measures it