Intelligent fire and MEP drawing review
A workflow that aligns drawing sheets and scale, recognises rooms and devices, and raises candidate fire and MEP conflicts across revisions. Each candidate carries its sheet, revision and coordinates, and each one gets a recorded reviewer decision.
Fire engineerReviewers have to find fire and MEP conflicts across large drawing sets that keep being revised, and then prove months later which clashes were checked and who decided what.
-
Align sheets and scaleAutomatedQueuedWorkingDoneSign-off
-
Recognise rooms and devicesAutomatedQueuedWorkingDoneSign-off
-
Raise issue candidatesAutomatedQueuedWorkingDoneSign-off
-
Compare revisionsAutomatedQueuedWorkingDoneSign-off
-
Record every dispositionReviewerQueuedWorkingDoneSign-off
- Who uses itFire engineer, drawing reviewer, project manager
- Lifecycle stageEngineering / Design
- Buyer groupTrack A · Engineering & Design
- RequirementsBRD v0.1, sent as written
What goes in, what comes out
Intelligent Drawing Review, step by step
Five steps, one decision point. The last step is a person, every time.
-
01
Automated
Align sheets and scale
Drawing sets registered so positions can be compared consistently across disciplines.
-
02
Automated
Recognise rooms and devices
Spaces, fire devices and service runs identified so the review has something to reason about.
-
03
Automated
Raise issue candidates
Cross-discipline conflicts surfaced as candidates, each pinned to a sheet, revision and coordinate.
-
04
Automated
Compare revisions
When revision C arrives, what changed is shown against what was already reviewed.
-
05
Reviewer
Record every disposition
Accepted, rejected or referred — with the reviewer's name against it.
Is the clash real?
Yes Accepted and given an ownerNo Rejected, with the reason recorded -
Output
What lands at the end
An annotated drawing issue register with sheet, revision, coordinates, discipline, owner, status and the reviewer's decision on every line.
Who’s involved
What you get
- Issue register
- Pinned coordinates
- Reviewer decisions
In the wireframe
A moved door and a sprinkler symbol near a new soffit generate two candidate issues.
Who does what, and who signs
Automated steps prepare the evidence. People make the calls.
Swipe to see the whole diagram
Why this costs you time today
Reviewers have to find fire and MEP conflicts across large drawing sets that keep being revised, and then prove months later which clashes were checked and who decided what. The proof usually lives in an email thread.
What this software will not do
Life-safety work. These limits are written into the requirements, not added as a disclaimer.
Specific to this workflow
Candidates are candidates. The software does not confirm that a clash is real or that a resolution is acceptable — a reviewer disposes of each one, and the register shows who.
It does not decide compliance
The software assembles evidence, retrieves source clauses and shows conflicts. It does not determine whether anything complies. A named engineer does.
It does not stand in for an authority
An approval recorded in the software never implies consent from an AHJ, Civil Defence, building control or a building surveyor.
Nothing leaves without a named reviewer
Every output carries who approved it. Anything unverified keeps a draft marker until someone signs it.
It does not do sealed engineering
Hydraulic network calculation, definitive sprinkler layout, sealed design, BIM geometry authoring and final cost estimates are all out of scope by design.
Your standards, not ours
NFPA, EN, BS, ISO, FM, UL, LPCB and Civil Defence appear in the requirements as examples. None is assumed to apply to your projects until you say so.
That is a claim about how fast Colakin builds software with DeX, and it is supported by delivered projects. It is not a claim about what any of these fifteen workflows will save your business. The requirements deliberately leave that to a pilot, measured against your own baseline.
From a question to a pilot, in five steps
Nothing hidden behind a discovery call. Stop at step one and keep the document.
- 01
You ask for the requirements document
The full BRD for the workflow you care about, sent as written.
Same day - 02
A ten-minute wireframe walkthrough
A clickable prototype of that one workflow.
10 minutes - 03
The Fire Fit Check
Five questions: fit, hours lost, who approves spend, whether your documents can be shared, and timing.
One call - 04
A scope built on your rules
Your standards, your document formats, your approval gates.
Within a week - 05
A pilot against your own baseline
One workflow, your data, your engineers.
Q1
Also in Engineering & Design
Each one stands alone. Take one first, then decide whether a second earns its place.
AI Fire Design & Engineering
Drawings and specs in. An evidence-linked design basis out.
Code & Specification Compliance
A clause-by-clause matrix. The reviewer decides, never the software.
Engineering Drawing Automation
Draft placement against approved criteria. The designer accepts.
Intelligent Drawing Review: questions
Does it replace a coordination review?
What happens on a revision?
Can it read our drawing conventions?
What does an auditor see?
Ask for the Intelligent Drawing Review requirements document
The business requirements document as written, including what it refuses to do. No brochure, no drip sequence.
- The requirements document, usually the same working day
- A ten-minute wireframe walkthrough with the people who specified it
- No claimed percentage saving — your pilot measures it