Fire project procurement and delivery intelligence
A workflow that imports approved material demand, matches it to purchase orders, tracks deliveries and detects shortages — then shows which site milestone each shortage actually moves. Expediting decisions get made against consequences rather than against a spreadsheet.
Procurement engineerApproved material needs, purchase orders and delivery dates sit in separate records.
-
Import demandProcurementQueuedWorkingDoneSign-off
-
Match purchase ordersAutomatedQueuedWorkingDoneSign-off
-
Track deliveriesProcurementQueuedWorkingDoneSign-off
-
Detect shortagesAutomatedQueuedWorkingDoneSign-off
-
Show schedule impactProject managerQueuedWorkingDoneSign-off
- Who uses itProcurement engineer, project manager
- Lifecycle stagePost-Sales / Project Delivery · also Operations
- Buyer groupTrack C · Project Delivery
- RequirementsBRD v0.1, sent as written
What goes in, what comes out
Procurement & Project Intelligence, step by step
Five steps, one decision point. The last step is a person, every time.
-
01
Procurement
Import demand
Approved material requirements, from a released BOM or entered directly.
-
02
Automated
Match purchase orders
Demand reconciled against what has actually been ordered.
-
03
Procurement
Track deliveries
Promised and revised dates held against the order.
-
04
Automated
Detect shortages
Gaps surfaced with the quantity and the date they bite.
Does the shortage hit a milestone?
Yes Expedite, with the impact shownNo Logged and monitored -
05
Project manager
Show schedule impact
The milestone affected, so expediting is a decision rather than a reflex.
-
Output
What lands at the end
A material availability dashboard, a shortage log, a supplier action list and a schedule impact view tying deliveries to milestones.
Who’s involved
What you get
- Availability dashboard
- Shortage log
- Schedule impact
In the wireframe
A buyer records a revised delivery date, links an alternate action, and shows the project manager the affected milestone.
Who does what, and who signs
Automated steps prepare the evidence. People make the calls.
Swipe to see the whole diagram
Why this costs you time today
Approved material needs, purchase orders and delivery dates sit in separate records. A shortage is invisible until it is urgent, and the link between a slipped delivery and a slipped milestone is reconstructed by hand.
What this software will not do
Life-safety work. These limits are written into the requirements, not added as a disclaimer.
Specific to this workflow
It does not place orders, negotiate with suppliers or reschedule the programme. It makes the shortage and its consequence visible to the people who do.
It does not decide compliance
The software assembles evidence, retrieves source clauses and shows conflicts. It does not determine whether anything complies. A named engineer does.
It does not stand in for an authority
An approval recorded in the software never implies consent from an AHJ, Civil Defence, building control or a building surveyor.
Nothing leaves without a named reviewer
Every output carries who approved it. Anything unverified keeps a draft marker until someone signs it.
It does not do sealed engineering
Hydraulic network calculation, definitive sprinkler layout, sealed design, BIM geometry authoring and final cost estimates are all out of scope by design.
Your standards, not ours
NFPA, EN, BS, ISO, FM, UL, LPCB and Civil Defence appear in the requirements as examples. None is assumed to apply to your projects until you say so.
That is a claim about how fast Colakin builds software with DeX, and it is supported by delivered projects. It is not a claim about what any of these fifteen workflows will save your business. The requirements deliberately leave that to a pilot, measured against your own baseline.
From a question to a pilot, in five steps
Nothing hidden behind a discovery call. Stop at step one and keep the document.
- 01
You ask for the requirements document
The full BRD for the workflow you care about, sent as written.
Same day - 02
A ten-minute wireframe walkthrough
A clickable prototype of that one workflow.
10 minutes - 03
The Fire Fit Check
Five questions: fit, hours lost, who approves spend, whether your documents can be shared, and timing.
One call - 04
A scope built on your rules
Your standards, your document formats, your approval gates.
Within a week - 05
A pilot against your own baseline
One workflow, your data, your engineers.
Q1
Also in Project Delivery
Each one stands alone. Take one first, then decide whether a second earns its place.
Procurement & Project Intelligence: questions
How quickly does a project manager learn about a slipped delivery?
Does it integrate with our ERP or purchasing system?
Does it order anything?
Can it run across multiple projects?
Ask for the Procurement & Project Intelligence requirements document
The business requirements document as written, including what it refuses to do. No brochure, no drip sequence.
- The requirements document, usually the same working day
- A ten-minute wireframe walkthrough with the people who specified it
- No claimed percentage saving — your pilot measures it