Fire system testing and commissioning assistant
A workflow that selects the test procedures, captures field results and photos, checks results against thresholds, manages defects and retests, and records witness approval. Handover evidence is assembled as the work happens rather than reconstructed afterwards.
Commissioning engineerField tests and their supporting evidence end up spread across forms, photos and phones.
-
Select proceduresEngineerQueuedWorkingDoneSign-off
-
Capture field resultsEngineerQueuedWorkingDoneSign-off
-
Check thresholdsAutomatedQueuedWorkingDoneSign-off
-
Manage defects and retestsEngineerQueuedWorkingDoneSign-off
-
Record witness approvalWitnessQueuedWorkingDoneSign-off
- Who uses itCommissioning engineer, witness, project manager
- Lifecycle stageTesting & Commissioning
- Buyer groupTrack D · Commissioning & Service
- RequirementsBRD v0.1, sent as written
What goes in, what comes out
Testing & Commissioning Assistant, step by step
Five steps, one decision point. The last step is a person, every time.
-
01
Engineer
Select procedures
The right test sheets for the systems actually installed.
-
02
Engineer
Capture field results
Readings and photographic evidence recorded where the test happens.
-
03
Automated
Check thresholds
Results measured against the acceptance criteria, with failures raised immediately.
Result within the threshold?
Yes Test passedNo Defect raised, retest scheduled -
04
Engineer
Manage defects and retests
Each defect tracked to closure with its retest evidence attached.
-
05
Witness
Record witness approval
A record without a witness signature stays pending. It does not quietly pass.
-
Output
What lands at the end
Test sheets, a deficiency log, the retest trail, a signed commissioning report and a handover evidence manifest.
Who’s involved
What you get
- Test sheets
- Deficiency log
- Retest trail
- Signed report
In the wireframe
A required witness signature is missing, so the record stays pending until captured, then joins a controlled commissioning report.
Who does what, and who signs
Automated steps prepare the evidence. People make the calls.
Swipe to see the whole diagram
Why this costs you time today
Field tests and their supporting evidence end up spread across forms, photos and phones. Proving at handover that every test was witnessed and every defect closed becomes its own small project.
What this software will not do
Life-safety work. These limits are written into the requirements, not added as a disclaimer.
Specific to this workflow
It does not certify a system or issue a completion certificate on anyone's behalf. It records what was tested, what failed, what was retested and who witnessed it.
It does not decide compliance
The software assembles evidence, retrieves source clauses and shows conflicts. It does not determine whether anything complies. A named engineer does.
It does not stand in for an authority
An approval recorded in the software never implies consent from an AHJ, Civil Defence, building control or a building surveyor.
Nothing leaves without a named reviewer
Every output carries who approved it. Anything unverified keeps a draft marker until someone signs it.
It does not do sealed engineering
Hydraulic network calculation, definitive sprinkler layout, sealed design, BIM geometry authoring and final cost estimates are all out of scope by design.
Your standards, not ours
NFPA, EN, BS, ISO, FM, UL, LPCB and Civil Defence appear in the requirements as examples. None is assumed to apply to your projects until you say so.
That is a claim about how fast Colakin builds software with DeX, and it is supported by delivered projects. It is not a claim about what any of these fifteen workflows will save your business. The requirements deliberately leave that to a pilot, measured against your own baseline.
From a question to a pilot, in five steps
Nothing hidden behind a discovery call. Stop at step one and keep the document.
- 01
You ask for the requirements document
The full BRD for the workflow you care about, sent as written.
Same day - 02
A ten-minute wireframe walkthrough
A clickable prototype of that one workflow.
10 minutes - 03
The Fire Fit Check
Five questions: fit, hours lost, who approves spend, whether your documents can be shared, and timing.
One call - 04
A scope built on your rules
Your standards, your document formats, your approval gates.
Within a week - 05
A pilot against your own baseline
One workflow, your data, your engineers.
Q1
Also in Commissioning & Service
Each one stands alone. Take one first, then decide whether a second earns its place.
Site Inspection & Maintenance
The client report comes from the record the technician signed.
Digital Asset & Maintenance History
One device, one timeline, a source behind every entry.
Testing & Commissioning Assistant: questions
What happens if a witness signature is missing?
Does it work offline on site?
How are defects closed out?
Can we hand the evidence pack straight to the client?
Ask for the Testing & Commissioning Assistant requirements document
The business requirements document as written, including what it refuses to do. No brochure, no drip sequence.
- The requirements document, usually the same working day
- A ten-minute wireframe walkthrough with the people who specified it
- No claimed percentage saving — your pilot measures it