Skip to main content

Stage 2 — Specification

⏱️ At a Glance DeX turns your Business Request into three documents here: the BRD (business case), the SRD (architecture), and the FSD (functional behavior). This is the same generation step whether you triggered it via One-Click Synthesize in Stage 1 or individually here.

Purpose: Synthesize structured requirement documents that translate business needs into technical and functional terms — ensuring alignment between stakeholders and delivery teams before any code is written.

📍 Pipeline position: Stage 2 of 9 — see the full pipeline map.


The Three Documents

DocumentFull NameAudienceAnswers
BRDBusiness Requirement DocumentStakeholders, Product OwnersWhy are we building this, and what does success look like?
SRDSoftware Requirement DocumentTechnical Leads, ArchitectsHow is this built — architecture, data, infrastructure?
FSDFunctional Specification DocumentDevelopers, QA EngineersExactly what must each feature do, screen by screen?

Generating the Documents

  1. From Stage 1 — Business Request, click "One-Click Synthesize (All 3 Docs)" to generate all three together, or open Stage 2 — Specification directly and generate each one individually.
  2. Watch for the "Synthesizing Project" status — this confirms DeX is generating your documents.
  3. Once generation is complete, the BRD, SRD, and FSD are available for review.
  4. For each document, you can:
    • Preview — Read the generated content
    • Edit — Refine any section directly in the editor
    • Download — Export the document (PDF or DOCX)
    • Regenerate — Re-run AI generation after refining your Stage 1 inputs

📝 If a document doesn't fully reflect your requirements, use Edit to adjust specific sections, or update your Stage 1 inputs and Regenerate for a fresh pass.


Worked Examples

Two real, generated specification sets are available as reference:

  • Loanmind AI (fintech lending platform) — full, unabbreviated documents: Sample BRD

📦 The Sample Documents folder is the best place to see what a complete, production-depth BRD/SRD/FSD trio looks like end-to-end, with nothing trimmed for documentation purposes.


What's Next

➡️ Stage 3 — Plan & Task — Convert the approved specification into a sprint plan and task breakdown.