Skip to content
MedTech Product Lifecycle Management

Device requirements, risks and evidence

Connect requirements, design outputs, verification and changes in one device record.

Every requirement traced to its risk and test Risk file on your ISO 14971 process UKCA and CE packs from one record
Device lifecycle workspace on DeX
Trace matrix live Example data
Product home
Status of one device
Wearable ECG patch WP-1 · Class IIaUKCA + CE
Define
Design inputs
Risk
Design & build
Verify & validate
Gate review
Release
7Open gaps
3Pending approvals
142Linked records

Recent changes

CR-014 · Adhesive supplier changeIn review
TP-031 results attachedLinked

Requirement tree

Linked to SR-01.1

CoveredIn progressGap
NeedRequirementRisk controlTestStatus
UN-01SR-01.1 Battery lifeRC-04 Low-battery warningTP-031Covered
UN-01SR-01.2 AdhesionRC-07 Skin-safe adhesiveNo test linkedGap
UN-02SR-02.1 Alert latencyRC-02 Watchdog timerTP-018In progress
UN-02SR-02.2 Alert deliveryNo control linkedTP-019Gap
UN-03SR-03.1 Data encryptionRC-11 Encrypted transferTP-040Covered

Generated from the links, so it never needs rebuilding before an audit.

HazardSeverityProbabilityControlsResidual riskLinks
H-03 Missed arrhythmiaSignal loss during wearS4P3RC-02, RC-07AcceptableSR-01.2 TP-018
H-05 Skin irritationAdhesive reactionS2P4RC-07ReviewSR-01.2 Test needed
H-08 Battery depletionUnannounced shutdownS3P1RC-04AcceptableSR-01.1 TP-031

Hazard log and controls aligned to the manufacturer's ISO 14971 process.

Gate 4 · Verification and validation · checklist

  • All requirements linked to a test
  • Risk controls verified
  • !Outstanding: SR-01.2 adhesion test not linked
  • Usability summary attached

Reviewers

LML. Morgan · Head of R&DSigned
DOD. Okafor · Head of QualitySigned
RSR. Shah · Regulatory affairsPending
Stage open. It locks when every reviewer has signed.

CR-014 · Description

Replace the skin adhesive with an equivalent from a second approved supplier to remove a single-source risk.
AI impact listDrafted by agent
Requirements 2
SR-01.2SR-04.1
Risks 2
H-05RC-07
Tests 3
TP-022TP-027TP-044
Documents 4
BOM-WP1SUP-12IFU-01TF-6.2

Approval route

  1. Impact assessment draftedDone
  2. Design engineer reviewDone
  3. 3Quality engineer approvalNow
  4. 4Regulatory assessmentNext
  5. 5Update all affected records in one passAfter approval

Completeness

82%UKCA pack

Source records

RequirementsRisk fileTest resultsDesign outputsApprovals
Why traceability breaks

The trace gets rebuilt before every audit

Auditors want every requirement traced through to a test. Most small and mid-sized manufacturers piece that together by hand.

What every audit asks you to prove, through every change RequirementRisk controlDesign outputTest result
TodayWith DeX
Design historyRequirements in documents, risks in spreadsheets, drawings in PDM, approvals in email.One linked record per device.
Trace matrixKept by hand. Out of date by the next audit.Generated from the links, with gaps flagged.
Change controlDays of searching to see what a change touches.Every affected item listed before approval.
Technical fileAssembled at submission, delaying market entry.Built on demand from current records.
UKCA and CESame evidence, packaged differently for each route.Market-specific packs from one record.
ToolingEnterprise PLM and eQMS cost too much for a few products.Built to your procedure. Your CAD and PDM stay.
Field feedbackComplaints never reach the design team in a usable form.Post-market findings feed the next design cycle.
What DeX does

Record maintenance and design review

A device lifecycle workspace built on DeX, set up to your design control procedure.

DeX agents

Keeping the record joined up

They link each record as it's added, flag anything missing, and work out what a change will touch before anyone approves it.

Your engineers and quality team

Approve every stage

E-sign at each design gate. Your CAD, PDM and document stores stay in place, connected by integration.

LinkedRequirements
LinkedRisks
LinkedDesign outputs
LinkedVerification
LinkedApprovals
LinkedChanges
From idea to release

Follow a device record through design and release

Select a stage to see the records and reviewer roles involved.

    Device record: Wearable ECG patch WP-1Example
    Record completeness
    5%
    What's included

    Design control sized for a handful of products

    Link
    Linked item model

    Needs, requirements, risks, outputs, tests and documents, all connected.

    Live trace matrix

    Generated from the links. Gaps highlighted.

    Control
    Risk management file

    Hazards and controls on your ISO 14971 process.

    Stage gates

    Your phases, checklists, reviewers and e-sign.

    Change
    Change impact analysis

    Agent lists what a change touches and drafts the assessment.

    Technical file assembly

    The file and market packs, built from current records.

    Document
    Document control

    Versioning, review, approval and controlled release.

    Supplier records

    Approved suppliers, component changes and their knock-on impact.

    Connect
    Integrations

    CAD or PDM, ERP, test systems and the DeX post-market hub.

    Audit trail

    Who changed what, when and why. Role-based access.

    Who it's for

    Built for teams heading to submission

    Daily users
    R&D and design engineersSystems engineersQuality engineersRegulatory affairs
    Contributors
    Manufacturing and operationsSupply chainClinical and usability
    Decision makers
    CTO or Head of R&DHead of QualityProgramme managers
    External
    Approved and notified bodiesContract manufacturersKey suppliers
    Best fit

    Device makers with a handful of products

    Device start-ups and scale-ups
    Spin-outs approaching first submission
    Established SMEs on ageing paper systems
    Contract design and manufacturing firms
    Continue exploring

    Related MedTech workflows