Device requirements, risks and evidence
Connect requirements, design outputs, verification and changes in one device record.
Recent changes
Requirement tree
Linked to SR-01.1
| Need | Requirement | Risk control | Test | Status |
|---|---|---|---|---|
| UN-01 | SR-01.1 Battery life | RC-04 Low-battery warning | TP-031 | Covered |
| UN-01 | SR-01.2 Adhesion | RC-07 Skin-safe adhesive | No test linked | Gap |
| UN-02 | SR-02.1 Alert latency | RC-02 Watchdog timer | TP-018 | In progress |
| UN-02 | SR-02.2 Alert delivery | No control linked | TP-019 | Gap |
| UN-03 | SR-03.1 Data encryption | RC-11 Encrypted transfer | TP-040 | Covered |
Generated from the links, so it never needs rebuilding before an audit.
| Hazard | Severity | Probability | Controls | Residual risk | Links |
|---|---|---|---|---|---|
| H-03 Missed arrhythmiaSignal loss during wear | S4 | P3 | RC-02, RC-07 | Acceptable | SR-01.2 TP-018 |
| H-05 Skin irritationAdhesive reaction | S2 | P4 | RC-07 | Review | SR-01.2 Test needed |
| H-08 Battery depletionUnannounced shutdown | S3 | P1 | RC-04 | Acceptable | SR-01.1 TP-031 |
Hazard log and controls aligned to the manufacturer's ISO 14971 process.
Gate 4 · Verification and validation · checklist
- All requirements linked to a test
- Risk controls verified
- !Outstanding: SR-01.2 adhesion test not linked
- Usability summary attached
Reviewers
CR-014 · Description
Approval route
- Impact assessment draftedDone
- Design engineer reviewDone
- 3Quality engineer approvalNow
- 4Regulatory assessmentNext
- 5Update all affected records in one passAfter approval
Completeness
Source records
The trace gets rebuilt before every audit
Auditors want every requirement traced through to a test. Most small and mid-sized manufacturers piece that together by hand.
Record maintenance and design review
A device lifecycle workspace built on DeX, set up to your design control procedure.
Keeping the record joined up
Link records, flag gaps and assess change impact before your team approves the change.
Approve every stage
E-sign at each design gate. Your CAD, PDM and document stores stay in place, connected by integration.
Follow a device record through design and release
Select a stage to see the records and reviewer roles involved.
Design control sized for a handful of products
Connect needs, requirements, risks, outputs and tests.
Generated from the links. Gaps highlighted.
Hazards and controls on your ISO 14971 process.
Your phases, checklists, reviewers and e-sign.
List affected records and draft the change assessment.
The file and market packs, built from current records.
Versioning, review, approval and controlled release.
Track suppliers and component changes.
Connect CAD/PDM, ERP, tests and post-market records.
Who changed what, when and why. Role-based access.